Advanced Search
Search Results
1481 total results found
Bilko Backoffice — Ops Infra (Logging Views + support@ Forwarding + Preflight)
Bilko Backoffice — Ops Infra (MC #103325) Branch: feat/103325-backoffice-infra | PR: #317 | Proveo verdict: PASS (2026-06-10) | Sibling: Backoffice Backend MVP (page 3100) 1. Cloud Logging Saved Views GCP project: tribal-sign-487920-k0 Bucket: _Default (g...
Bilko Prod Topology — app.bilko.cloud Cutover (reuse-demo-as-prod)
Bilko Prod Topology — app.bilko.cloud Cutover (reuse-demo-as-prod) MC: #103300 | Completed: 2026-06-10 | Proveo verdict: CUTOVER PASS | Evidence root: /tmp/evidence-103300/ CRITICAL REFERENCE — do not make assumptions about which DB is prod or what da...
SEO Portal Path C — Delegated Service-Account GSC/GA via Workload Identity Federation (MC #103390)
Overview MC #103390 — SEO Readiness Portal Path C replaces the blocked per-client Google OAuth flow with a delegated read-only service account authenticated via Workload Identity Federation (WIF). No static JSON key is created or stored; the portal au...
Bilko Sentinel — Tier-1 Bounded Auto-Remediation (Shadow-First) 2026-06-11
Status BUILT — SHADOW mode. MC #103435 (AgentForge build) + MC #103436 (Securion adversarial review). Parent MC #103328. Module: /Users/makinja/system/tools/bilko-sentinel-tier1.js. Tier-0 remains the active detection layer; Tier-1 is shadow-calibrating only. ...
LumisCare Wave-1 Durability Redeploy & Validation — 2026-06-11
LumisCare Wave-1 Durability Redeploy & Validation — 2026-06-11 Scope MC #103376 / parent #103260: prove Wave-1 live artifacts are durable after merge to dev, rebuilt and redeployed from merged dev, then independently validated. Source and live artifacts Sourc...
Bilko HR eRačun — sveRačun (PostLink) Integration & Status Model
OverviewProvider: sveRačun by PostLink d.o.o. (Velika Gorica, HR).Contact: David Krišto [email protected], Ivan Jurić [email protected] docs: https://sveracun-public-api.redocly.app/Replaces the abandoned Storecove plan (MC #8675, not approved)...
Bilko Observability & Self-Healing — Program Overview (MC #103328)
Bilko Observability & Self-Healing — Program Overview (MC #103328) This is the single entry point for the entire Bilko observability and self-healing program. It links every sub-page, states current status, and gives a quick orientation for any CEO, agent, or...
Bilko Security & Engineering Decisions (Observability Program)
Bilko Security & Engineering Decisions (Observability Program) This page covers security findings, live fixes, engineering decisions, and arming prerequisites for the Bilko observability/self-healing program. It is a companion to the Program Overview (MC #103...
Bilko Backoffice — Support & Fix Loop Runbook
Bilko Backoffice — Support & Fix Loop Runbook Scope: Operational runbook for ALAI staff handling live customer problems on app.bilko.cloud. Environment: backend bilko-api-demo, frontend bilko-web-demo, database bilko-demo-db (GCP Cloud Run / Cloud SQL). Relat...
HR eRačun — Architecture Decision Record (ADR) + Build Plan
STATUS: design accepted; build in progress (WP1+). Production activation PARKED pending legal (B1/B2) + the multi-tenant decision. NOTE: app-api.bilko.cloud maps to bilko-api-demo — the demo backend serves the bilko.cloud domain; activation is a real-domain d...
Bilko Signup Jurisdiction Fix — MC #103501
Bilko Signup Jurisdiction Fix — MC #103501 Status: Branch-verified only. Merge, stage deploy, and production deploy are PENDING as of 2026-06-12. Branch: fix/103501-oauth-jurisdiction | PR: #356 | Commits: 418a35f0, 9e05e5c6 Mesh record: mesh-thr-6a18851a-476...
Lesson E+B Hard Enforcement — PI Agent Plane (MC #103499)
Lesson E + B Hard Enforcement — PI Agent Plane (MC #103499) Date: 2026-06-12 Owner: John (orchestrator) Status: Implemented + Proveo-verified Problem Lesson E (credential-pair validation) and Lesson B (verify-by-live-outcome) were hard-enforced on the Claude C...
Bilko Modul B (Knjigovodstvo) — Spec + Board presuda (2026-06-13)
TL;DR — 4/4 CONDITIONAL GO (jednoglasno). Modul B = dovršenje Modula A, ne ekspanzija. Četiri tvrda uvjeta (U1–U4) moraju biti zadovoljeni prije B-1 sprintova. Gate je komercijalni: 1 imenovan, obvezani ovlašteni računovođa kao design-partner. CEO direktiva...
Bilko Modul B-1 — GL Foundation Build (2026-06-13)
TL;DR Bilko Modul B-1 GL Foundation je KOMPLETAN. Backend (commit 6efb16f9) + frontend (commiti 69c87cf3 + b1f6401a) izgradeni. GL subsystem je iza BILKO_ACCOUNTING_GL + GL_AUTO_POST flagova — obje default OFF globalno. Modul A (fakturisanje) potpuno ne...
Bilko B5 — Per-Line VAT Exemption Classification (MC #103593, 2026-06-15)
Context & DecisionDate: 2026-06-15 | MC: #103593 | Decision authority: CEO (Alem Basic)Domain expert Vlado Brkanć reviewed the existing VAT exemption approach during his B5 classification review (MC #103508). The prior system derived a single document-leve...
Bilko Azure Observability + MS for Startups Credit Setup (2026-06-15)
Purpose Cross $100/month in foundational Azure spend to automatically unlock the Microsoft for Startups $25K credit tier. The model is usage-triggered, not referral-gated: once cumulative Azure spend reaches the threshold, the Founders Hub dashboard upgrades ...
Diff-only reviewer context contract (token discipline)
Diff-only reviewer context contract (token discipline) Book: System Architecture Status: Implemented and Proveo-validated — MC #103627 (2026-06-15) Branch: mc-103627-diff-only-context @ commit 568e9cee0 in ~/.claude (not yet merged to master) Why this exists ...
Prometheus Best Practices — USE vs RED
Prometheus Best Practices and Pitfalls Source: YouTube Learning — Julius Volz (Prometheus co-founder), Swiss Cloud Native Day 2021 Indexed: 2026-06-15 (MC #103620) USE vs RED: Decision Framework USE Method (Resource-Oriented Systems) For infrastructure compon...