Advanced Search
Search Results
1739 total results found
Bilko demo — reverse-engineering + feature list + live Playwright test (MC #102883) — 2026-06-03
Summary MC #102883 reverse-engineered the Bilko demo product from existing code into a full spec chain, then validated the live demo with Playwright. Target: bilko-demo.alai.no (HR/EUR/PDV demo tenant). No deploy; no product code changed (docs + e2e spec only)...
SEO Readiness Portal — Self-Serve Intake (Architecture + Operator Runbook)
SEO Readiness Portal — Self-Serve Intake (Architecture + Operator Runbook) Shipped: 2026-06-04 Image: alairegistry.azurecr.io/seo-readiness-portal:20260604-selfserve-intake Validation: MC #102923 Proveo PASS — /tmp/alai/seo-wsv-evidence/VALIDATION-REPORT.md D...
Bilko demo — 7 real-user bug fixes + live verification (MC #102887) — 2026-06-04
Summary CEO smoke-tested the live Bilko demo and found real bugs in minutes that the prior Phase-B QA (#102883) missed because it tested API-with-token, not real UI clicks. This task ran a REAL-USER browser walkthrough, found 7 bugs, fixed all 7, and LIVE-veri...
System Remediation 2026-06-04 (Library, Companies, Hooks, Agents)
System Remediation — 2026-06-04 (Library, Companies, Hooks, Agents) Author: John (AI Director) · Date: 2026-06-04 · Trigger: CEO inspection of ALAI tools/library/skills/hooks/MCP/companies/agents. This page documents a tool-verified remediation sweep across fo...
P2P Pairing Skills — CC sender + peer responder (MC #102988)
ALAI Company Mesh — P2P Pairing Skills (CC sender + peer responder) Built: MC #102988 (responder side), 2026-06-05. Extended by MC #102990 (bidirectional), MC #102993 (timeout guard), MC #102996 (autonomous file-mesh loop), and MC #103009 (native-channel decis...
Bilko Mobile
Native iOS/Android mobile companion docs, Entra External ID auth bridge, Phase 0 status and implementation specs
ZAKON-QA — Real-User Testing Standard (mandatory all agents) — 2026-06-05
ZAKON-QA: Real-User Testing Standard (MANDATORY for ALL agents) Authority: CEO directive 2026-06-05 (Bilko demo bug campaign, MC #102887). Proven across 14+ bugs the CEO found in minutes that "54/54 green" API tests missed. This is now the required testing met...
Bilko BUG-005 — revenueMTD / credit-note documentType + RLS migration landmine
Bilko BUG-005 — revenueMTD negative (credit-note documentType + RLS migration landmine) MC: #103001 (child #102887) | Fixed: 2026-06-05 | Tag: v0.2.18 / PR #255 Symptom Dashboard KPI revenueMTD showed -457.50 on bilko-demo. CEO-visible. Root cause (two layers)...
ac-grind.js — $0 Local-Model Code Grinder (per-finding)
What it isA wrapper around aider + the autocoder.js differential-tsc-gate logic that fixes one finding/file per pass using a local $0 model (Ollama qwen2.5-coder:32b-instruct-q8_0 @ 10.0.0.2:11434, or MLX qwen3-coder-30b @ 11437). Implements the measured recip...
MC 103057 — Bilko Demo API Hang Validation 2026-06-06
MC #103057 — Bilko demo API hang recurrence validation (3f56ab5) Deployment PR: https://github.com/johnatbasicas/bilko/pull/267 Merge commit: 3f56ab5198fd37b43cbbf8a917d7ce4236d42104 Stage Cloud Build: 7b413a82-256a-4cfc-8917-b0b06376d850 = SUCCESS Stage API ...
Bilko demo — receipt upload/download fix (GCS shared storage) — MC #103095 (2026-06-07)
1. SymptomCEO reported that receipt upload (PNG, PDF, JPG) was not working — a central part of the app. Investigation showed upload itself succeeded (HTTP 201) but viewing/downloading the receipt returned intermittent HTTP 404 approximately 60% of the time. Fr...
Bilko Mobile Phase 0 Auth Bridge — Status 2026-06-05
null Update 2026-07-10 — T1 CIAM mobile app provisioning COMPLETE (MC #105193) Canonical mobile app registration: 916bb9f3-658d-4729-b5a0-64b1f157c8c2 "Bilko Mobile (Native)" — single-tenant (AzureADMyOrg), public client, PKCE, redirects com.alai.bilko://aut...
Bilko Mobile — README
Bilko Mobile Companion Product and architecture docs for the Bilko native mobile companion app. Decision update 2026-06-04: Bilko mobile targets iPhone + Samsung/Android native app delivery via React Native + Expo. Older PWA-for-MVP assumptions are superseded ...
Bilko Mobile PRD
Bilko Mobile Companion PRD Product: Bilko Mobile Companion Markets: Croatia (HR), Serbia (RS), Bosnia & Herzegovina (BA) Status: Direction approved — native iPhone + Samsung/Android companion; product scope remains draft Date: 2026-05-25 Updated: 2026-06-04 O...
Bilko Mobile Architecture
Bilko Mobile Companion Architecture Product: Bilko Mobile Companion Markets: HR / RS / BA Status: Direction approved — iPhone + Samsung/Android native companion; implementation details remain draft Date: 2026-05-25 Updated: 2026-06-04 Related PRD: docs/mobile...
Bilko Mobile Implementation Spec — Phase 1
Bilko Mobile Companion — Phase 1 Implementation Spec Document type: Implementation Specification (Phase 1) MC task: #102483 Author: Paul Hudson / Skybound Date: 2026-05-28 Status: Direction approved; not dispatch-ready until Phase 0 auth/backend blockers are ...
ADR-037 — Bilko Native Mobile + Entra External ID Auth
ADR-037 — Bilko Native Mobile Companion and Entra External ID Auth Status: Accepted for mobile direction / Phase 0 backend work required Date: 2026-06-04 Scope: Bilko customer-facing mobile companion app for iPhone and Samsung/Android Context Bilko has exist...
Bilko Mobile Entra Auth Bridge Spec
Bilko Mobile — Entra External ID Auth Bridge Spec Status: Phase 0 backend prerequisite Date: 2026-06-04 Related: docs/architecture/ADR-037-BILKO-MOBILE-NATIVE-ENTRA-AUTH.md, docs/mobile/MOBILE-IMPL-SPEC-PHASE1.md Purpose Enable Bilko native mobile login for ...