Deployment Checklist
Deployment Checklist
Project: {{PROJECT_NAME}} Version: {{VERSION}} Date: {{DATE}} Author: {{AUTHOR}} Status: Draft | In Review | Approved Reviewers: {{REVIEWERS}}
Document History
| Version | Date | Author | Changes |
|---|---|---|---|
| 0.1 | {{DATE}} | {{AUTHOR}} | Initial draft |
Deployment Metadata
| Field | Value |
|---|---|
| Version | {{VERSION}} |
| Target Environment | {{ENVIRONMENT}} |
| Deployment Date | {{DATE}} |
| Deployment Time | {{TIME}} {{TIMEZONE}} |
| Deploy Engineer | {{ENGINEER}} |
| Approver | {{APPROVER}} |
| Deployment Type | {{TYPE}} |
| Change Request # | {{CR_NUMBER}} |
| Rollback Version | {{ROLLBACK_VERSION}} |
1. Pre-Deployment Checklist
Code Quality Gates
- Code reviewed and approved — all PRs in this release have ≥ {{REVIEW_COUNT}} approvals
- All unit tests passing — CI pipeline green on the release branch
- All integration tests passing — CI pipeline integration stage green
- Code coverage meets minimum — ≥ {{COV_GATE}}% (current: {{CURRENT_COV}}%)
- No HIGH/CRITICAL security findings — SAST and SCA scans clean
- No secrets detected — secret scanning clean
- Linting passes — no errors in CI lint stage
Staging Verification
- Staging deployment complete — this exact artifact has been deployed to staging
- E2E tests passing on staging — automated suite green ({{PASS_COUNT}}/{{TOTAL_COUNT}} tests)
- Manual QA sign-off obtained — QA team has reviewed new features
- Performance baseline not degraded — P95 within {{PERF_GATE}}% of baseline
- Visual regression checks passed (if UI changes)
Database & Migrations
- Database migrations reviewed — SQL reviewed by a second person
- Migrations tested on staging — ran successfully, duration recorded: {{MIGRATION_TIME}}min
- Down/rollback migration tested —
migrate downexecutes without errors - Migration script idempotent — safe to run twice without errors
- Estimated migration time on production documented: {{PROD_MIGRATION_TIME}}min
- Data backup taken (if destructive migration) — backup ID: {{BACKUP_ID}}
Environment & Configuration
- All environment variables documented and updated in {{SECRET_STORE}}
- New secrets provisioned in production secret store
- Configuration changes reviewed — no unintended changes from staging
- External API keys are live (not sandbox) credentials
- DNS records verified (if changes required)
Feature Flags
- Feature flags configured — new features default OFF in production
- Kill switches in place for all new significant features
- Rollout plan documented — which flags, in what order, over what timeline
- Feature flag audit complete — no stale flags from previous releases
Rollback Readiness
- Rollback plan documented — see Section 5 and rollback-plan.md
- Previous version artifact available —
{{PREV_IMAGE}}in registry - Rollback tested on staging (if DB migrations are included)
- Rollback owner assigned — {{ROLLBACK_OWNER}} is available during deployment
Operational Readiness
- On-call engineer notified — {{ONCALL}} is aware and available
- Deployment window confirmed — {{TIME}} - {{END_TIME}} (off-peak)
- Monitoring dashboards open and ready
- War room set up — {{WAR_ROOM_LINK}}
- Change request approved — CR-{{CR_NUMBER}} approved by {{APPROVER}} on {{DATE}}
2. During Deployment
| Step | Time | Actor | Status | Notes |
|---|---|---|---|---|
| Announce deployment start in war room | {{ENGINEER}} | |||
| Enable maintenance mode (if required) | {{ENGINEER}} | |||
Trigger deployment pipeline: {{PIPELINE_LINK}} |
{{ENGINEER}} | |||
| Monitor deployment progress | {{ENGINEER}} | Watching for errors | ||
| Run database migrations (if applicable) | {{DB_OWNER}} | Duration: {{TIME}}min | ||
Verify migration success: {{VERIFY_CMD}} |
{{DB_OWNER}} | |||
| Confirm new instances healthy (health checks green) | {{ENGINEER}} | |||
| Confirm all instances running new version | {{ENGINEER}} | |||
Run smoke tests: bash scripts/smoke-tests.sh {{ENV}} |
{{QA}} | |||
Verify health endpoint: curl {{URL}}/health |
{{ENGINEER}} | |||
| Disable maintenance mode (if enabled) | {{ENGINEER}} |
3. Post-Deployment Checklist
Immediate Verification (First 15 Minutes)
- Health checks passing — all instances healthy per load balancer
- Smoke tests pass — automated smoke suite green
- Critical user journey manual test — manually verify {{CRITICAL_JOURNEY}}
- Error rate normal — < {{ERROR_THRESHOLD}}% (check {{DASHBOARD_LINK}})
- P99 latency normal — < {{P99_THRESHOLD}}ms
- Database connections normal — no connection pool saturation
- No unexpected errors in logs — {{LOG_DASHBOARD_LINK}} shows clean logs
Feature Validation (First 30 Minutes)
- New features functional — quick manual test of each feature in scope
- Feature flags enabled per rollout plan — {{FF_DASHBOARD}} shows correct state
- Third-party integrations working — payments, email, external APIs responding
- Version confirmed —
GET /api/versionor equivalent returns{{VERSION}}
Monitoring Setup (First 60 Minutes)
- Performance baseline compared — P95 matches or beats staging baseline
- CPU and memory normal — no upward trend
- Alerting verified — test alert confirms delivery to on-call
- Stakeholders notified — release announcement sent to {{NOTIFY_LIST}}
- Documentation updated — release notes published
4. Rollback Procedure (Quick Reference)
Rollback triggers (any one sufficient):
- Smoke tests fail after deployment
- Error rate > {{ROLLBACK_ERROR}}% for > {{ROLLBACK_DURATION}} consecutive minutes
- P99 > {{ROLLBACK_P99}}ms sustained
- Data integrity issue detected
Rollback steps:
# 1. Announce in war room: "Initiating rollback to {{ROLLBACK_VERSION}}"
# 2. Trigger rollback:
{{ROLLBACK_CMD}}
# 3. If DB migration was included — run down migration:
{{DOWN_MIGRATION_CMD}}
# 4. Verify rollback:
curl {{URL}}/health
bash scripts/smoke-tests.sh {{ENV}}
Expected rollback time: {{ROLLBACK_TIME}} minutes Full rollback procedure: rollback-plan.md
5. Emergency Deployment Process
Emergency deployments require:
- Sign-off from {{EMERGENCY_AUTHORITY}} (Engineering Manager or above)
- At least {{EMERGENCY_REVIEWS}} code reviewer (can be async if truly urgent)
- Staging deployment and smoke test (cannot be skipped)
- Enhanced post-deploy monitoring for {{EMERGENCY_MONITOR}}h
- Full retroactive change request within {{CR_SLA}}h of deployment
Emergency deployment allowed: Security vulnerabilities, data loss bugs, P1 service outages
6. Deployment Window & Blackout Periods
Standard deployment window: {{DEPLOY_WINDOW}} Emergency deployments: Any time, with approvals
Blackout periods (no production deployments):
| Period | Dates | Reason |
|---|---|---|
| End of year | {{EOY_START}} – {{EOY_END}} | High traffic, minimal support |
| {{EVENT_1}} | {{DATE_1}} | {{REASON_1}} |
| {{EVENT_2}} | {{DATE_2}} | {{REASON_2}} |
Sign-Off
Pre-deployment confirmed by: {{ENGINEER}} on {{DATE}} at {{TIME}} Deployment completed by: {{ENGINEER}} on {{DATE}} at {{TIME}} Post-deployment verified by: {{ENGINEER}} on {{DATE}} at {{TIME}}
Related Documents
Approval
| Role | Name | Date | Signature |
|---|---|---|---|
| Author | |||
| Reviewer | |||
| Approver |