Lessons Learned: Bilko

Project: Bilko — Balkan Accounting SaaS Version: 0.1 Date: 2026-02-23 Author: John (AI Director) Status: Draft Reviewers: Alem Bašić (CEO)

Document History

Version Date Author Changes
0.1 2026-02-23 John (AI Director) Initial entry — Phase 1 kickoff learnings

"Lessons learned without behavior change is not learning." — Alem Bašić, 2026-02-13 (ZAKON #0)

Every entry in this log must produce either a systemic fix (hook/tool/rule) or a concrete behavior change. Observations without action items do not belong here.


1. Session Metadata — Phase 1 Kickoff Review

Field Value
Session Type Phase Review (after Pipeline Gate 8 pass + initial build)
Project Bilko
Phase / Sprint Pre-Sprint 1 — Phase 1 kickoff
Period Covered 2026-02-19 – 2026-02-23
Facilitator John (AI Director)
Participants John, Alem Bašić
Date of Session 2026-02-23
Duration Retrospective of first 4 days

2. What Went Well (Keep Doing)

# What Went Well Why It Worked How to Preserve Category
KD-01 8-gate pipeline forced all critical research before coding began Gates prevented building on wrong assumptions; regulatory research (MULTI-REGION-OVERVIEW.md) was detailed and accurate Continue using pipeline gates for Phase 2 (Croatia) and Phase 3 (BiH); enforce gate passage before any new country's features Process
KD-02 Database schema (15 models) designed before writing any application code Schema aligned with accounting law requirements (double-entry, NUMERIC, audit trail) from day 1; no retroactive migrations Always design data model first for financial features; NEVER write API code against an undefined schema Technical
KD-03 NUMERIC(19,4) for all monetary fields decided upfront and enforced in schema Prevented entire class of floating-point accounting errors; found in Fiken research CI test: fail if any new field for monetary values uses Float/Decimal without explicit 4dp precision; document in CLAUDE.md Technical
KD-04 Regulatory research completed and documented before building SEF API requirements, PDV rates, Croatian eRačun timing — all known before design phase Research-first mandate in project charter; Asmir as ongoing regulatory advisor Process
KD-05 CEO approval gate (Gate 8) prevents building orphaned features Alem reviewed full plan before code was written; GO decision is documented and traceable Maintain Gate 8 for each major phase/country expansion Process

Highlights

KD-02 Detail: The decision to define all 15 Prisma models (Organization, User, Invoice, InvoiceItem, Transaction, etc.) before writing a single API endpoint proved to be the most valuable architectural decision of Phase 1. When the backend starts being built, the developer (human or AI) has a complete, validated schema to work against — no guessing about data shapes. The schema covers double-entry (debitAccountId + creditAccountId in Transaction), multi-currency (ExchangeRate model with locked rates), and audit trail (LoggedAction append-only). This pattern should be standard for all future Bilko features.


3. What Didn't Go Well (Stop Doing)

# What Didn't Work Root Cause Impact (1-10) Action Item Owner Deadline
SD-01 Frontend built entirely with mock data — 8 pages, zero real API connections Prototype-speed MVP prioritized demo-ability over production-readiness; no explicit decision to replace mock data before launch 10 CI check: grep for mock-data.ts imports outside test files; fail build in staging/production John Sprint 1
SD-02 packages/ui component library left empty — all components in apps/web, creating future duplication risk "We'll extract later" reasoning; never happened during MVP build 4 Document as TD-003; schedule for Phase 2 before mobile work starts John 2026-05-01
SD-03 No CI/CD pipeline established before writing application code Infrastructure "can wait" assumption; now blocking safe iteration 8 CI/CD setup is Sprint 1 task 1 before any API endpoints John 2026-03-07
SD-04 API-REFERENCE.md not created alongside the schema and routes structure Documentation always deferred in early phases; creates frontend/backend misalignment 5 Every new API endpoint must have its Request/Response schema documented in API-REFERENCE.md in the same PR John Ongoing
SD-05 No unit tests written during MVP build Speed prioritized; tests "added later" — never happened 9 Test must be written in the same sprint as the feature, not deferred John Ongoing

Root Cause Analysis — Deep Dives

SD-01: Mock Data Throughout Frontend

Problem: All 8 frontend pages show hardcoded mock data. Beta testers would see fake numbers. Cannot test real API integration.

5 Whys:

  1. Why is all data mocked? → Frontend was built as a prototype to show design/flow, not as production code
  2. Why was it built as prototype only? → Gate 8 (CEO approval) was needed before real backend investment; prototype reduced risk
  3. Why wasn't mock replacement scheduled explicitly? → The PIPELINE.md "Next Steps" listed it but no MC task was created with a deadline
  4. Why was no MC task created? → Prototype phase didn't have sprint planning; items added to informal list
  5. Why did informal list not get actioned? → No hook or gate enforcing the replacement before beta access

Root Cause: No automated enforcement that mock data must be replaced before staging deployment. Systemic Fix: CI check in apps/api/src/ and apps/web/ — grep for mock-data.ts imports outside /test/ directories; fail build if found in staging/production environment. Add to .github/workflows/ci.yml. Ljestvica Fikseva (ZAKON #1): Hook > Tool > Rule > CLAUDE.md > Memory → Using CI hook (strongest enforcement)


SD-05: No Tests Written During MVP Build

Problem: 0% test coverage on financial logic (PDV, double-entry, SEF). Accounting software without tests is a liability — a PDV calculation bug could cause users to file incorrect tax returns.

5 Whys:

  1. Why are there no tests? → They were "deferred" to after the feature was "working"
  2. Why were they deferred? → Speed pressure to show CEO a working prototype
  3. Why did "working" not include tests? → No definition of "done" included test coverage
  4. Why was there no DoD? → Project was in prototype phase with informal standards
  5. Why were informal standards accepted? → No enforcement mechanism (no CI, no PR gate)

Root Cause: No CI gate requiring tests before merge; no DoD including test coverage. Systemic Fix: GitHub Actions CI: npm test -- --coverage --coverageThreshold='{"global":{"lines":80}}' — fails PR if coverage below 80% overall or below 95% for src/services/ (financial logic). This is non-negotiable before Sprint 2 merges. Ljestvica Fikseva: CI coverage gate → fails PR merge.


4. What to Try Next (Start Doing)

# What to Try Expected Benefit Hypothesis Success Metric Trial Period
ST-01 Write tests FIRST (TDD) for financial logic (PDV, double-entry, SEF) Catches accounting bugs before they reach users; forces clear spec before coding If we write Given/When/Then tests for PDV calculation before writing the calculation, then PDV accuracy errors drop to 0 Zero PDV calculation bugs in beta; CI balance check passes 100% Sprint 2-4
ST-02 Create API-REFERENCE.md endpoint-by-endpoint alongside backend implementation Eliminates frontend/backend sync issues; enables frontend developer (or agent) to start immediately If every endpoint has documented Request/Response before frontend implements it, then integration time drops 50% Zero "unexpected API shape" issues during frontend-backend connection sprint Sprint 2
ST-03 SEF sandbox test on every PR touching invoice logic Catches SEF breaking changes before they reach production users If we run SEF sandbox test in CI for every invoice change, then SEF regression bugs = 0 in production Zero SEF regressions post-launch Sprint 3 (when SEF built)

5. Key Findings by Category

5.1 Technical Findings

# Finding Impact Recommendation
TF-01 Prisma's Decimal type maps cleanly to NUMERIC(19,4) — zero extra work for financial precision High positive Continue using Decimal for all monetary Prisma fields; never use Float
TF-02 LoggedAction as append-only audit table is a strong pattern — enforces immutability at schema level High positive Apply same pattern to other sensitive tables in future products (Drop, BasicFakta)
TF-03 Turborepo monorepo structure enables shared packages (database, ui) but requires discipline — empty packages create confusion Medium Either fill packages immediately or don't create them; no empty scaffolds
TF-04 Next.js 15 App Router + React Server Components significantly changes how data fetching works — team must understand before building High Document RSC vs client component decision boundary in CLAUDE.md

Technical Patterns Observed:

  • "Schema first, endpoints second, frontend third" — the correct build order for financial software; schema ensures all features are feasible
  • Monorepo shared packages need a charter: what goes in packages/ui, what stays in apps/web — decide before Sprint 2

5.2 Process Findings

# Finding Root Cause Recommendation
PF-01 8-gate pipeline prevented scope creep effectively — every decision was documented before coding Explicit gate criteria with documented evidence Apply same pipeline to Croatia (Phase 2) and BiH (Phase 3); don't skip gates even if process feels familiar
PF-02 "Next Steps" in PIPELINE.md without MC tasks = invisible work No translation from documentation to task management Every "Next Step" in any doc must have a corresponding MC task created immediately
PF-03 Prototype → production transition requires explicit decision and enforcement, not assumption Prototype mode is sticky — it continues until something forces a change Launch gate checklist must include "zero mock data imports verified by CI"

Process Patterns Observed:

  • Documentation-first works for planning but requires enforcement mechanisms to drive action
  • Sprint planning discipline is critical even for AI-only teams — without sprints, work becomes unordered

5.3 Communication Findings

# Finding Stakeholder Impact Recommendation
CF-01 Weekly Slack summary to Alem keeps CEO aligned without overhead meetings Alem can make informed go/no-go decisions asynchronously Maintain weekly sprint summary format from Communication Plan
CF-02 Regulatory questions need Asmir's input — cannot be resolved by research alone Wrong SEF implementation would cause launch failure Asmir review at every SEF-touching sprint; not just at start

5.4 Tools & Infrastructure Findings

# Finding Impact Recommendation
IF-01 No CI/CD pipeline means every deploy is a manual risk High — production incidents have no automated safety net CI/CD is Sprint 1 task 1, not an afterthought
IF-02 SEF sandbox environment must be set up before SEF integration sprint begins Medium — delay if sandbox access not ready Alem/Asmir to secure SEF sandbox credentials by 2026-03-01

5.5 Team & Collaboration Findings

# Finding Impact Recommendation
TM-01 AI agent team (John + builder/validator agents) works well for structured implementation tasks but requires extremely detailed specs — vague requirements produce vague code High Every FR must have explicit Acceptance Criteria before being assigned to a builder agent
TM-02 Financial domain requires accounting expertise that pure coding agents don't have — PDV, double-entry, SEF need validation by someone who knows the law Critical Asmir review for all regulatory features; automated accounting logic tests are the safety net

6. Action Items

# Action Item Category Owner Sprint / Deadline Priority Status
AI-01 Set up CI/CD pipeline (GitHub Actions) — include: lint, type-check, tests, coverage gate, mock-data import check Infrastructure John Sprint 1 (by 2026-03-07) P1 Open
AI-02 Write unit tests for tax.service.ts (PDV calculation) as first test file — TDD model Testing builder agent Sprint 2 start (2026-03-07) P1 Open
AI-03 Create apps/api/docs/API-REFERENCE.md — document every endpoint as it is built Documentation John Ongoing from Sprint 1 P2 Open
AI-04 Add CI check: grep for mock-data.ts in non-test files — fail build if found in staging env Tools/Infrastructure John Sprint 1 (by 2026-03-07) P1 Open
AI-05 Secure SEF sandbox credentials from APR via Asmir Regulatory Alem + Asmir By 2026-03-01 P1 Open
AI-06 Create MC tasks for every "Next Step" in PIPELINE.md Process John Now P2 Open
AI-07 Asmir to review SEF integration design before Sprint 3 implementation Regulatory John By 2026-03-14 P1 Open
AI-08 Define RSC vs client component decision boundary for Bilko in CLAUDE.md Technical John Sprint 1 P2 Open

7. Metrics Comparison — Planned vs. Actual

7.1 Timeline (Phase 1 kickoff only)

Milestone Planned Actual Variance Root Cause
All 8 pipeline gates 2026-02-19 2026-02-20 +1 day Gate 5-8 validation took longer than expected; thorough — good
Backend foundation (auth, 4 endpoints) 2026-02-20 2026-02-20 0 On target
Full 50 endpoints 2026-03-07 TBD TBD Sprint 1

7.2 Budget (Phase 1 so far)

Category Planned (EUR) Actual (EUR) Variance Notes
Research + design + schema ~€1,500 ~€800 -€700 AI-assisted research more efficient than estimated
Backend foundation (auth) ~€500 ~€300 -€200 4 endpoints in 1 session
Running total ~€2,000 ~€1,100 -€900 Under budget so far

7.3 Quality

Metric Target Actual Status
Test coverage ≥ 80% 0% (not yet written) ❌ In progress
Critical bugs at this stage 0 0
Pipeline gate pass rate 8/8 8/8
Database schema completeness 15 models 15 models

8. Recommendations for Future Projects

# Recommendation Category Confidence Applicable When
REC-01 Define all database models before writing any API endpoints or frontend code Technical High Any data-driven application; especially financial
REC-02 Use pipeline gates (8-gate or adapted) before investing in build phase for any new product Process High All new ALAI products
REC-03 Set up CI/CD in Day 1 of Sprint 1 — never defer infrastructure; it becomes load-bearing Technical High Every project
REC-04 For regulated domains (accounting, finance, health): TDD is not optional; tests are the compliance proof Technical High Any compliance-regulated feature
REC-05 Research regulatory requirements with a local expert (Asmir for Balkans) before designing features that touch them Process High Any Balkan market expansion

Top 3 Most Important Learnings

  1. Schema First, Always: The 15-model Prisma schema designed before writing a single line of application code is why Bilko's data architecture is sound. The schema was validated against accounting law (double-entry), PRD features, and multi-currency requirements all at once. Future features should follow the same discipline: design the data model, get it reviewed, then build.

  2. Mock Data Is a Prototype Trap: Shipping a frontend with mock data creates a false sense of completeness. The 8 pages look done but nothing works end-to-end. In future builds: either build frontend and backend in parallel (stub real API from day 1), or explicitly schedule "replace mock with real" as a first-class sprint task with CI enforcement.

  3. Regulatory Compliance Is Not a Sprint Task — It's an Ongoing Advisor Relationship: SEF is not just "call an API." It's a living government system with evolving requirements, certificate requirements, and edge cases that only practitioners know. Asmir's involvement is not optional — it's risk mitigation. Budget time for regulatory review at every sprint touching financial compliance.


9. Knowledge Base Contribution

Finding Contribution Type Target System Status Owner
NUMERIC(19,4) for all monetary fields Rule added to Bilko CLAUDE.md ~/ALAI/products/Bilko/CLAUDE.md Done (already in CLAUDE.md) John
Pipeline gate process Template ~/ALAI/products/Bilko/PIPELINE.md Done John
Mock data replacement pattern HiveMind entry HiveMind Open John
Schema-first pattern HiveMind entry HiveMind Open John

HiveMind entries to add:

node ~/system/agents/hivemind/hivemind.js post "Bilko pattern: Always design Prisma schema before API endpoints. Schema = contract. Validated against accounting law + PRD features before writing any code."
node ~/system/agents/hivemind/hivemind.js post "Bilko lesson: Mock data in frontend is a prototype trap. Enforce removal with CI grep check before staging deployment. See CROSS-CUTTING/tech-debt-log.md TD-001."

Approval

Role Name Date Signature
Author John (AI Director) 2026-02-23
Reviewer
Project Manager John 2026-02-23
AI Director (John) John 2026-02-23
Team Alem Bašić