Skip to main content
Advanced Search
Search Terms
Content Type

Exact Matches
Tag Searches
Date Options
Updated after
Updated before
Created after
Created before

Search Results

1253 total results found

Bilko SEF Adapter — Reference Implementation

Bilko — Balkan Accounting SaaS

$(cat /tmp/sef-adapter-page.html | jq -Rs .)

staleness
needs-review

Bilko Storecove HR Adapter — Peppol Option B Implementation

Bilko — Balkan Accounting SaaS

$(cat /tmp/storecove-hr-page.html | jq -Rs .)

staleness
needs-review

Bilko Flyway Baseline Strategy

Bilko — Balkan Accounting SaaS

$(cat /tmp/flyway-baseline-page.html | jq -Rs .)

staleness
needs-review

Bilko Phase 1 Track B — Execution Record

Bilko — Balkan Accounting SaaS

$(cat /tmp/phase1b-execution-page.html | jq -Rs .)

staleness
needs-review

Landing Page

Drop (getdrop.no)

Landing PageOverviewURL: https://getdrop.noPurpose: Multi-language marketing landing page for Drop — fintech payment appTarget users: All residents in Norway/Scandinavia (not diaspora-only)ArchitectureHosting: Cloudflare PagesZone ID: 0e4476892bfc1eaace41a80d6...

staleness
needs-review

Bilko Deploy — Standard Operating Procedure

Infrastructure & DevOps

$(cat /tmp/bilko-deploy-sop.html | jq -Rs .)

staleness
needs-review

Bilko Deploy — Standard Operating Procedure

Infrastructure & DevOps

Bilko Deploy — Standard Operating Procedure Last updated: 2026-04-22 Owner: FlowForge (Kelsey Hightower) Status: ACTIVE Cloud Run Architecture GCP Project: tribal-sign-487920-k0 Region: europe-north1 Services: bilko-web — Next.js 15 frontend (ma...

staleness
needs-review

Incident Postmortem — Bilko Deploy Fix 2026-04-22

Operations

Incident Postmortem — Bilko Deploy Fix 2026-04-22 Date: 2026-04-22 Severity: High (CEO time wasted + security leak) Status: Resolved Type: Blameless Postmortem Summary A 2-hour bug fix sprint (MC tasks #8626, #8627, #8628) aimed at fixing 3 bugs i...

staleness
needs-review

drop-srbija-followup-plan-2026-04-23

Specs & Plans

Drop Srbija — Follow-Up Plan Author: John (AI Director, ALAI Holding AS) Date: 2026-04-23 Status: ✅ APPROVED (CEO Alem Basic, 2026-04-24) — Track A+B formally signed off, de-facto already executing (MC #8807, #8808) Supersedes: Phase 0 Task 0a of drop-srbija-p...

AI Factory Map

System Architecture

AI Factory Map Last Updated: 2026-05-27 (AI Factory / P2P reliability update) Purpose: Single-page surface map of ALAI's AI system. Read in <10 minutes to understand the entire fleet. Audience: John (AI Director), Alem (CEO), specialist agents AI Factory P2P g...

ucenje v3 — aha math + pčele + interaktivan 6×19

ALAI Website (alai.no)

ucenje v3 — aha math + pčele + interaktivan 6×19\n\nBackground\n\nOn 2026-04-22, CEO Alem Basic provided feedback via Slack about the /ucenje section:\n\n\n\Ne sviđa mi se kompletan UI/UX. Previše [teksta] ima za to što poučavamo. Trebamo promijeniti stil. Hoć...

staleness
needs-review

Pčele × 6×19 × Honeycomb Conjecture — strukturalna paralela

Quran Research — Computational Analysis

Pčele × 6×19 × Honeycomb Conjecture — strukturalna paralela\n\nAutor: ALAI, 2026\nDatum: 2026-04-23\nKontekst: Priprema za alai.no/ucenje — istraživanje broja 19 u Kur'anu\n\n\n\nSažetak\n\nKur'an sadrži 114 sura — što je precizno 6×19. Ovaj dokument istražuje...

staleness
needs-review

Mehanik Phase 2 — Pre-Dispatch Gate System

System Architecture

Mehanik Phase 2 — Pre-Dispatch Gate System Status: LIVE since 2026-04-25 (MC #9231 deploy) Reference: Root-cause analysis MC #9223, synthesis at /tmp/9223-final-synthesis.md Author: Sentinel-Architect + Petter Graff (CodeCraft) Commissioned By: CEO after Drop ...

staleness
needs-review

Muqatta'at as 19-TET Harmonic Signatures — Discovery, Correction, Survival

Quran Research — Computational Analysis

Round 7 — Inverzna pretraga: Da li ALR jedinstven među svim 5-podskupovima? Egzaktno smo izračunali alif+lam+ra letter-sum za svih 114 sura, pa provjerili svih C(114,5) = 144,840,729 mogućih 5-podskupova: Mjera Broj % Tjesniji od ALR (spread < 4 mod 19)...

staleness
needs-review

ZAKON FEASIBILITY — Pre-Execution Constraint Consistency Check

Rules & Standards

ZAKON FEASIBILITY: Pre-Execution Constraint Consistency Check Status: ENFORCED Created: 2026-04-26 Trigger: Every task before execution (John + every specialist agent) Origin: 2026-04-26 incident — "odbroji do 10 ali počni od 11" — agent attempted to satisfy m...

staleness
needs-review

GCP Auth Runbook — alai-cli-deployer SA (MC #9522)

Runbooks

GCP Auth Runbook (post-MC #9522) Status Active as of 2026-04-26. SA key created, activated, verified. Primary auth Service account: [email protected] Key file: ~/.gcloud/alai-cli-deployer.json (mode 0600) Key ID: ...

staleness
needs-review

Azure Auth Runbook — alai-cli-deployer SP (MC #9524)

Runbooks

Azure Auth Runbook (post-MC #9524) Status Active as of 2026-04-26. SP created, authenticated, verified. Primary auth Service principal: alai-cli-deployer (appId: f2a3b94b-46a5-4a5c-ae34-a222a35bf5b9) Tenant: 3454a03f-20b4-4bda-a116-2293c459aecd (alemalai.onmi...

staleness
needs-review

Set-Cookie Cross-Origin Regression — RCA + Fix Pattern

Bilko — Balkan Accounting SaaS

Bilko Set-Cookie Cross-Origin Regression — RCA + Fix Pattern MC: #9499 (final fix), #9495 (canary discovery), #9398 (original same-origin fix) Resolved: 2026-04-27 Final fix: bilko-web rev 00029-zkp + bilko-api rev 00062-gwx Problem User authentication failed...

staleness
needs-review